Saturday, May 21, 2005

The waterfall


Here are the rocks all laid out. I still need to add the liner so numbering the rocks with chalk will help when I put them back.


The rockwork is complete!
Posted by Picasa

Tuesday, May 17, 2005

The rock-work begins


We put down a layer of bricks with mortar and then added a row of rocks, keeping the liner behind it all.
Posted by Picasa

Tuesday, May 10, 2005

Fill 'er up!


Underlay


Liner


Water
Posted by Picasa

Friday, May 6, 2005

The Dig


Using a laser level keeps things, um ... level


See?


Ready for liner!
Posted by Picasa

Thursday, May 5, 2005

Cutting out the lower pond


Is this big enough?


Nope ... this looks better!
Posted by Picasa

Tuesday, May 3, 2005

Leveling and filling the upper pond


For the top pond, we used a pre-formed liner since it had the lip built in already.