Cedar Trim


The trim hangs about 1 1/2" over the water and about 1/2" above it. I installed it over the weekend. I cut 1/4" thick plastic washers to go under the 2x6 cedar trim. This will let the water from the pond run under the boards if the level gets to high and help prevent rot. Then, I counter-sunk 4" lag bolts through the boards and plugged them with hot glue and dowels. I'll sand and stain the boards and dowels soon. It's supposed to warm up in the next few days! Then on to the skimmer.

Comments

Popular posts from this blog

New Fiberglass Matala Filter Box